IPC Meets with EPA Transition Team on RCRA Hazardous Waste Generator Improvements Rule


Reading time ( words)

IPC met last week with EPA senior staff to discuss our concerns with the recently published Hazardous Waste Generator Improvements Rule and the February 24 petition for review filed with the D.C. Circuit Court of Appeals by IPC and eight other trade associations.

Although EPA’s rule includes some common-sense updates that will bring greater efficiency and clarity to the Hazardous Waste Generator regulatory program, other aspects of the rule are quite draconian.  IPC and the other associations are especially concerned about a provision that will change the criteria under which a generator of hazardous waste can be treated as operating a RCRA Treatment, Storage and Disposal (TSDF) facility that is operating without a required permit. Under the new rule, failure to meet any one of EPA’s long list of ‘conditions for exemption’ could subject a generator to multiple violations and substantial penalties. Even a minor deviation in compliance would cause a generator to now be considered an illegal TSDF.

The meeting was held to elevate the issue with the new EPA transition team and to discuss options moving forward, including an agreement to put the petition for review lawsuit in abeyance while EPA and IPC discuss the possibility of EPA proposing changes to the rule.

Share

Print


Suggested Items

SMTA Europe Webinar: What Is a Good Solder Joint, and How Can Solder Joints Be Tested?

11/18/2020 | Pete Starkey, I-Connect007
What is a good solder joint? And how can they be tested not only for purposes of process characterisation, optimisation, monitoring, and control but also for ensuring their long-term reliability? Pete Starkey details a webinar organised by the Europe Chapter of SMTA that was presented by Bob Willis, an expert in soldering, assembly technologies, and failure analysis.

IPC Standards Development: Business Challenges and an Inside View

10/28/2020 | Graham Naisbitt, Gen3 Systems
With increasing frequency, standardising the standards, such as ISO 9201, imposes certain rules that must be met to ensure “fair play” amongst the supply chain. There will be those familiar with hearing about “false positives/negatives” and “never trust the salesman,” so mitigating these is no easy task. However, there is the chance for each 5-30 Task Group to review industry requirements and set out the work program for the ensuing period. With that in mind, much of what follows is based on comments we learn about from our industry around the world, many of whom are not yet IPC members. Yes, this is a membership recruitment drive, unashamedly, as well as a search for volunteers willing to help create the standards of tomorrow.

How to Benefit From Robotic Soldering Processes

10/28/2020 | Pete Starkey, I-Connect007
Webinars are in vogue! But in Pete Starkey's experience, the master of the technical webinar with many years’ experience of delivering first-rate events is Bob Willis—electronics assembly specialist, soldering expert, and provider of training and consultancy in electronics manufacture. Here, Pete recaps Bob’s presentation on the upcoming robotic soldering experience.



Copyright © 2020 I-Connect007. All rights reserved.