Quality Assurance Through Testing


Reading time ( words)

The PCB Magazine columnist Todd Kolmodin of Gardien Services discusses the challenges related to the electrical testing of high-density PCBs, and what is required to meet IPC and military specifications.

Watch the interview here.

Share

Print


Suggested Items

Just Ask Happy: Monitoring Via Reliability on a Lot-by-Lot Basis

07/29/2020 | I-Connect007 Editorial Team
We asked for you to send in your questions for Happy Holden, and you took us up on it! The questions you've posed run the gamut by covering technology, the worldwide fab market, and everything in between. How would you monitor microvia reliability on a lot-by-lot basis?

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

07/17/2020 | Andy Shaughnessy, Design007 Magazine
Like a bad penny, COVID-19 just keeps coming back and affecting the PCB industry. This week, we saw more industry events going fully virtual—a trend that’s likely to continue. But as Chris Mitchell explains, the COVID-19 outbreak is also forcing lawmakers and organizations to work together for the good of the U.S. electronics supply chain. Sometimes, it takes a crisis to make everyone cooperate, so let’s celebrate these little victories.

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

07/10/2020 | Nolan Johnson, PCB007
The common theme in this week’s Top 5 editor’s picks is “change.” We’re talking change in the form of forwarding process, achieving milestones, evolving, and improving metrics. This week’s picks are not only newsworthy but also captured reader attention based on metrics. If you haven’t read any other news items from the industry this week, I propose these five must-reads.



Copyright © 2020 I-Connect007. All rights reserved.