Heltzel: It’s a bit more complicated than that. There are space projects, some are done by ESA, and ESA issues contracts for those space projects. Those contracts include somewhere in the supply chain that some supplier will manufacture the equipment that will eventually be built into a satellite. That equipment manufacturer is responsible for procuring the PCBs. My job is independent from those space projects. I have the general support function just for the PCB technology.
Matties: I see. What’s the most surprising thing that you’ve seen in your career? The thing that made you say, “I can’t believe they did this,” or “We should’ve done it that way.”
Heltzel: I think the lesson that has been learned is the fact that the standard we’ve been using in space was allowed to be outdated. That causes some problems. We had to provide maintenance in the form of memoranda. It’s a European industry standard, but that standard was allowed to be slightly outdated because when PCB technology increased in terms of ability, the standard was not in sync with that capability and of course with the new capabilities, you get different failure modes. The fact that this is now being revised will be a major milestone.
Matties: How long does it take you to revise the standard and make it become live?
Heltzel: This one has now been running for two years.
Matties: So it’s quite a process. It seems rather long, doesn’t it? If it’s something outdated to begin with...
Heltzel: Yes, but then after that, I expect it will be up-to-date for many years. The industry in space isn’t changing that quickly—it is still quick but not as quick as an iPhone.
Matties: Which is more powerful than our first rocket ship that went to space, I think.
Heltzel: In terms of computing power, yes.
Matties: There’s something odd about that. Is there anything that circuit board fabricators should know?
Heltzel: We rely on them to do their own quality control and we will check and jump in where needed. Also, if they need us or need a bigger expertise, if they don’t have resources, we are there to support them. When I say ‘we’ I am talking about the full supply chain, but in the end it is their responsibility to make sure that the reliability of their product is good and they should have the resources available.
Matties: Thinking about the laminate, are you specifying material or do you leave that entirely up to your contractor as well?
Heltzel: The original design for the qualified stackup is up to the industry to select, but once it’s selected it’s cast in stone. It gets written up in the process identification document and that
cannot be changed without performing the qualification work.
Matties: Thanks for spending time for this interview. I appreciate it.
Editor's Note: This article originally appeared in the August 2016 issue of The PCB Magazine.
Suggested Items
The Chemical Connection: Reducing Etch System Water Usage, Part 2
05/02/2024 | Don Ball -- Column: The Chemical ConnectionIn my last column, I reviewed some relatively simple ways to reduce water usage in existing etch systems: cutting down cooling coil water flow, adding chillers to replace plant water for cooling, lowering flow rate nozzles for rinses, etc. This month, I’ll continue with more ways to control water usage in your etcher. Most of these are not easily retrofittable to existing equipment but should be given serious consideration when new equipment is contemplated. With the right combination of add-ons, it is possible to bring the amount of water used in an etch system to almost zero.
Designer’s Notebook: What Designers Need to Know About Manufacturing, Part 2
04/24/2024 | Vern Solberg -- Column: Designer's NotebookThe printed circuit board (PCB) is the primary base element for providing the interconnect platform for mounting and electrically joining electronic components. When assessing PCB design complexity, first consider the component area and board area ratio. If the surface area for the component interface is restricted, it may justify adopting multilayer or multilayer sequential buildup (SBU) PCB fabrication to enable a more efficient sub-surface circuit interconnect.
Insulectro’s 'Storekeepers' Extend Their Welcome to Technology Village at IPC APEX EXPO
04/03/2024 | InsulectroInsulectro, the largest distributor of materials for use in the manufacture of PCBs and printed electronics, welcomes attendees to its TECHNOLOGY VILLAGE during this year’s IPC APEX EXPO at the Anaheim Convention Center, April 9-11, 2024.
ENNOVI Introduces a New Flexible Circuit Production Process for Low Voltage Connectivity in EV Battery Cell Contacting Systems
04/03/2024 | PRNewswireENNOVI, a mobility electrification solutions partner, introduces a more advanced and sustainable way of producing flexible circuits for low voltage signals in electric vehicle (EV) battery cell contacting systems.
Heavy Copper PCBs: Bridging the Gap Between Design and Fabrication, Part 1
04/01/2024 | Yash Sutariya, Saturn Electronics ServicesThey call me Sparky. This is due to my talent for getting shocked by a variety of voltages and because I cannot seem to keep my hands out of power control cabinets. While I do not have the time to throw the knife switch to the off position, that doesn’t stop me from sticking screwdrivers into the fuse boxes. In all honesty, I’m lucky to be alive. Fortunately, I also have a talent for building high-voltage heavy copper circuit boards. Since this is where I spend most of my time, I can guide you through some potential design for manufacturability (DFM) hazards you may encounter with heavy copper design.