Tramonto Circuits Achieves 94.96% Overall On-Time Delivery in 2017


Reading time ( words)

Tramonto Circuits is pleased to announce that overall on-time delivery (OTD) in 2017 increased to 94.96%. This key performance indicator confirms Tramonto Circuits’ commitment to improvement and customer requirements. 

Motivated by a company poll that showed customers’ top two requirements for their printed circuit board suppliers were “quality” and “on time delivery,” Tramonto Circuits set aggressive goals and included them as key performance indicators (KPI) for 2017. The goal set for OTD was 95% overall, and the goal for RMA requests was twelve or less.

The overall OTD improved to 94.96% for 2017 and a total of 12 RMAs were recorded. This improvement included a 20% increase in part numbers shipped. These numbers, although lofty, show the commitment the company has made to its customers.

“We have improved our OTD by nearly a percentage point again this year,” said President John Talbot. “We have already set 95% OTD goals again for 2018 and strive to improve our RMA numbers as well. Our staff is proud of the accomplishment and stand ready to improve in the coming year.”

About Tramonto Circuits

The mission of Tramonto Circuits is “to consistently provide its customers with high quality electronic products and services that meet or exceed their expectations.” A manufacturer of flexible and rigid printed circuits, Tramonto Circuits provides electronic circuits and assemblies to original equipment manufacturers worldwide.

Tramonto Circuits is based in St. Paul, Minnesota. More information is available here

Share

Print


Suggested Items

Prototron Receives MIL-31032 and AS9100 Certifications

10/22/2019 | Steve Williams, The Right Approach Consulting LLC
Kim O’Neil, general manager of Prototron Circuits in Tucson, Arizona, discusses the company’s recent MIL-31032 certification and how this experience prepared them for the AS9100 certification. He also explained why auditing is a good thing for any company’s processes and highlighted some of the areas that the auditors inspected.

Virtual Verification Station From CIMS Enhances AOI Capabilities

06/28/2019 | Barry Matties, I-Connect007
At this year’s CPCA Show, CIMS Marketing and Technical Director Vladi Kaplan spoke to Barry Matties about a number of add-ons CIMS designed to further enhance their AOI capabilities and systems. He described their Virtual Verification Station (VVS), CIMS Quality Center (CQC), and Software Development Kit (SDK) as well as trends he sees with laser via inspection.

Quality by Design

06/14/2019 | Nolan Johnson, I-Connect007
The design team’s files and the accompanying documentation is the real-world implementation plan to turn the OEM’s concepts and marketing research into a viable, physical, competitive product. Unless manufacturing defies the build instructions from the designers, the product will only be as manufacturable as the design files themselves.



Copyright © 2019 I-Connect007. All rights reserved.